Open / Close Advertisement

INTECO to Build ESR Plant for Uddeholm in Sweden

Though this is the first INTECO supply, this unit will represent the 10th remelting furnace to be installed by the Swedish company, the world’s biggest producer of ESR remelted tool steel. This most modern ESR furnace will be operated at a maximum operation pressure of 3 bars and will be capable of remelting ingots with a maximum diameter of 1250 mm and a weight of approximately 30 metric tons. Additionally it will have all state-of-the-art features such as protective gas operation, a full coaxial high current line and a completely updated control system of newest generation.
 
The opportunity to deliver a second identical furnace has also been discussed, but this has to be decided depending on the market situation in the near future. INTECO’s entire staff is motivated and excited about this challenging project and will use this opportunity to demonstrate its leading position as a supplier of equipment and technology in the field of electroslag remelting.